Description

The building is divided in two separate levels: a superior level with the laboratories, offices and public access, and a lower level with the production plant and the loading deck.

The project uses topography to hide part of the program underground with a water roof, making the complex look smaller and controlling the views of the visitors.

Clermond-Ferrand (France)

2009

Area:
2050 m2

Architecture:
Pol Femenias

Quantity Surveyor :
Josep Maria Fosalba

Engineer :
Carles Edo

Client:
Private

Images:
©PFA

Related Projects